← StrategyJourney 8 campaign brief
Journey 8, Engineering briefPack version: 14 Oct 2026, 13:07 (London)
Leave feedback
The Engineering brief

What Journey 8 needs, and who owns it: nothing for Engineering to build

🔧 Open the marketing to engineering board
The board is the system of record: live rows, owners, status, and each row's today-vs-to-be.
The one hard rule: two touches per slip episode, then silence, enforced in the canvas, never by goodwill. Any bid or purchase exits the episode instantly; one lapse owner per customer at a time (journey_state arbitrates against win-back); and no broadcast lands on an open save episode once the stand-down segment is wired. A third touch does not exist anywhere in this journey.
1The requirements

No send in this journey is fired natively by the app itself, so there is no native-to-Braze migration roster here: everything that sends today already lives in the messaging platform or an external one, and each row’s call sits on the As-is tab.

5 rows: 2 data points and 3 computed traits (Analytics builds, no engineering hours). The D badge is the walkthrough pin number. Delivery fixes and app defects follow in their own sections.

Events, feeds and data points

This journey asks for no new events or feeds: entry, exits and the save's figures all run on data that exists or that Analytics computes and pipes themselves. The two rows here are stated so the picture is complete, not because they carry engineering hours.

The data pointWhat exists todayThe workWhat it must carryPhase · status · depends on
D7The transaction events that end the episode
bid_add · purchase events, real time
Nothing: live and verified. Named so the exit contract is stated once.
LIVE IN BRAZE
Live in the sender, verified.
No workAny bid or purchase, on any product, ends the save episode the moment it happens; the growth journeys own what comes next. This is the journey's only real-time dependency and it already runs.
Used where: The instant saved exit
PHASE 1
ships now
Live
Nothing.
D6Lifecycle stage, and the ownership flag
ACTIVE_USER_LABEL · journey_state, campaign-written
Nothing to build for entry; the stand-down wiring above makes the flag readable by broadcast segments.
CAMPAIGN-OWNED
The stage label is live in the sender; the ownership flag is written by the canvas.
Braze configurationThe lifecycle stage gates entry and the day-60 hand-off to win-back; the ownership flag enforces one lapse owner per customer. The flag is campaign-written, so batch sends cannot exclude on it until the stand-down segment is wired.
Used where: Entry, the arbitration against win-back, and the broadcast stand-down
PHASE 1
ships now
Wiring at build
The stand-down segment above.
▸ The 3 computed traits this journey reads: Analytics builds them, no engineering hours; and what is not listed, and why

Computed traits this journey reads · Analytics builds, no engineering hours

Named here so the full picture is one table. The contract is the row: what each trait computes, what the Braze CDI holds today, and what remains to build.

The computed traitWhat exists todayThe workWhat it must carryPhase · status · depends on
D1The entry cohort: the slip boundary
personal_median_inter_txn_gap, nightly · interim: the daily state change
Build the cadence trait once, shared with Journey 6: it times that journey's nudge at about 1.0x and opens this journey's slip window at about 1.5x.
DOES NOT EXIST YET
The state-change entry attributes are live in the Braze CDI (verified 31 Aug): churn_risk_band, previous_churn_risk_band, churn_risk_band_shift_date, daily refresh. The cadence trait is the remaining build.
One computed trait, two journeysEntry fires when a customer passes about 1.5x their own median purchase gap. Until the trait ships, the daily active-status state change is the buildable interim, one day of latency, already in the sender. The churn score refines entry later; it is not a launch gate.
Used where: Entry, the save message
PHASE 1
ships now
With Analytics
The shared-trait build, commissioned once with Journey 6.
D3The usual route and the from-price
usual_route · from_price, nightly computed
Add both attributes to the daily sync payload; Analytics compute and pipe them from their side.
LIVE IN BRAZE
Verified live in the Braze CDI, 31 Aug: usual_route and usual_route_bidding_from_price reach Braze (about 39 percent coverage, fluctuating weekly).
Sync payload extension, Analytics-ownedThe line that makes the save concrete: their most-travelled route over twelve months (ties to most recent) and a from-price computed nightly from what actually sold on the route, never a live lookup and never an up-to claim. A missing figure falls to the designed fallback.
Used where: The save message and the second knock
PHASE 1
ships now
Delivered; coverage fluctuates with the auction calendar
The CDI question above.
D4The savings figure, for power users
total_saved, in the Braze CDI
Delivered: the figure is in the Braze CDI for every user; the power-only cut and the low-value guardrail apply at selection. Phase 2, so it is not missed: the proper full-history rebuild that makes the figure genuinely lifetime, one build shared with the post-trip journey's savings traits.
LIVE IN BRAZE
total_saved landed in the Braze CDI on 27 Aug.
Sync payload extension, Analytics-ownedThe recognition line: power users open on what they have saved with us. The figure counts upgrade savings since January 2026, not lifetime; below the guardrail the designed no-figure fallback renders instead.
Used where: The save message, the recognition register
PHASE 1
ships now
Delivered; floor and cap to confirm
The CDI question above.

Not listed because there is nothing to build: the transaction events that end the episode (live, verified); the daily active-status label the interim entry rides (already in the sender); and the ownership flag the campaign writes and reads itself.

Four changes the customer never sees: what is broken today, the fix we are asking Engineering for, and why it belongs in this journey rather than a general engineering backlog. None is a comm and none needs a decision from Marketing. Each one either loses a message this journey depends on, or decides whether something else can be built at all.

2Three delivery fixes

None of the three is a new event or feed: one is a verification question, two are configuration and wiring on systems that already run.

The delivery fixThe fix we are asking forWho does itPhase
The journey ownership flag (journey_state): the shared buildBuild journey_state once, estate-wide: one attribute carrying the owning journey, the episode id and the entry time. Every owning canvas writes it at entry and clears it at exit; every broadcast and wave segment excludes on it; it is mirrored nightly to the warehouse and readable at render by the home surface. The Braze developer wires the canvases and the exclusion segments, Engineering mirrors it to the warehouse and exposes the render read, Analytics keeps the state history. One board row carries it for all ten journeys.BACKEND ENGPHASE 1
ships now
▸ The problem today, and why it sits here
The problem today
Every journey's stand-down and hand-off assumes one owner per customer, and the flag those rules read is campaign-written today: invisible to broadcast segments, the warehouse and the app, so the rule cannot be enforced. Two live journeys can reach one customer in one week with clashing messages.
Why it sits in this journey
Here it writes the save episode, hands it to win-back at day 60, and stands the seasonal weekly down: a gate on the 7 September go-live.
The one open question: new attributes into the Snowflake-to-Braze pipeIvi answers the CDI question; if Engineering is needed it is one small pipeline change, and it becomes this journey's only engineering ask.BACKEND ENGPHASE 1
ships now
▸ The problem today, and why it sits here
The problem today
Analytics can compute the from-price, the lifetime saving and the cadence trait, and pipe them from their side. What nobody has confirmed is whether ADDING new attributes to the pipe needs anything from Engineering, for example registering them in a CDI mapping, and who sizes them against the platform's attribute rate limits before cutover.
Why it sits in this journey
Every personalised figure in the save rides this pipe. If the answer is no, Engineering's involvement in this journey is zero.
Payload extensions: the churn score and journey_state, cost-sized against the quotaCost-size both extensions against the data-point quota before they ship; they queue behind the launch set.BACKEND ENGPHASE 2
gated
▸ The problem today, and why it sits here
The problem today
The daily sync carries a bounded data-point budget. The churn-score and journey-state payload extensions refine the entry and the arbitration but are not launch gates.
Why it sits in this journey
Engineering's 29 July quota concern stands and is scoped: it binds the refinements, never the launch.
3One defect in the app itself

One front-end instrumentation gap. It does not block launch; it blocks reading the one in-app surface the journey borrows.

The defectThe fix we are asking for
The in-app banner's impressions and clicks do not registerFix the in-app message instrumentation so impressions and clicks register.
▸ The problem today, and why it matters here
The problem today
The Braze instrumentation gap on the mid-Home slot: impressions and clicks from the in-app banner do not reach analytics, so the opt-in banner's two-ask rest rule cannot be verified from data.
Why it matters here
The no-marketing-channel cohort is about 830 a month; the banner is the only way this journey ever reaches them, and today its performance is unreadable.

Source: the 29 to 31 July scoping round, the 20 August data-availability sweep, and the comms estate record. The CDI question is with Ivi; nothing here is on the sprint board because nothing needs sprint hours until it is answered.